Building the Factory Floor

As the Shier Winery becomes licensed, its time to plumb the lines and get the physical plant in order.  Sickler's Glass in Ulster Park, New York will be installing 86 inch high by 1/2 inch thick tempered glass panels that will enclose the bonded winery area, excluding any personal property of yours truly.  To prepare for fermentation tanks, plumbing modification are needed so I can rinse and drain the tanks.  A double-wide wash basin and pump will provide for drainage.   An overhead spigot will provide for spray hose connections above the tanks.

Before installation of water line, drain pump and wash basin.

The Shier lab before installation of tempered glass.

Comments

Popular posts from this blog

Winery Approved after Public Hearing!

2017 Riesling Clearing